Yokogawa Corporate Profile (2025)_90s
1:36
This video looks at Yokogawa's efforts with customers to achieve a sustainable society based on its ability to measure and connect.
Related Videos
In New Videos
-
Play video Start Wide Area Monitoring System with ease on a small scale
Start Wide Area Monitoring System with ease on a small scale
Wide Area Monitoring System (WAMS) is a cloud-based system, enabling centralized management across multiple facilities and locations. Please check out this video to see the value of remote monitoring with our Wide Area Monitoring System.
2:36
-
Play video Yokogawa Sustainability - "Three Goals" vision for society toward 2050
Yokogawa Sustainability - "Three Goals" vision for society toward 2050
Yokogawa has established the sustainability goals 'Three Goals' as the vision for the society toward 2050, and we commit to realize a sustainable world together with our stakeholders.
0:42
-
Play video Ore to Opportunity: Advancing Intelligent Mining
Ore to Opportunity: Advancing Intelligent Mining
Discover how Yokogawa leverages AI, digital twins, and integrated data to enhance mining operations—prioritizing safety, efficiency, and sustainability to shape a smarter, more sustainable future for mining worldwide.
3:27
-
Play video Yokogawa Corporate Profile (2025)
Yokogawa Corporate Profile (2025)
This video looks at Yokogawa's efforts with customers to achieve a sustainable society based on its ability to measure and connect.
6:30
-
Play video TDLS8200 FLOWCELL and SHORT FLOWCELL TYPE Overview
TDLS8200 FLOWCELL and SHORT FLOWCELL TYPE Overview
Yokogawa offers new measurement solution migrating traditional gas analyzers with sample conditioning system. TDLS8200 flow cell-models enable high-speed gas analysis with minimum maintenance.
3:46
-
Play video Introducing OpreX Plant Stewardship
Introducing OpreX Plant Stewardship
This video is an introduction to OpreX Plant Stewardship—Yokogawa's new lifecycle service concept and strategic framework. It highlights customer challenges, 5 key dimensions, and the 4-step approach of this risk-based program for plant optimization.
5:05